Satallite Maintenance - Estleback Corporation
#1
Star 

The Governance of Estleback Corporation in EvoCity decided it's time that we update our satellite. The international Estleback Corproration governance supported our plans and therefore we proceeded with this somewhat update. Our previous satellite was 7X022, it's 7 meters tall and it was built 2001. It's outdated, and our personal radio wasn't covering the whole city anymore. Too many frequencies was interfering with ours.

The engineers had come up with a rather splendid mechanism. It's has the functionality as the Satallite X1000v2, but 30x smaller. By extracting the core and making some changes in the code, we were able to exclude the antennas. That means, a little chip does now give out a single (can be expanded) signal to the entire EvoCity. The quality of the sound and at the same time the reach of it.

The Engineers and me had designed a rather unique facility for this very mission. A rocket had been placed and so had the equipments. There were however some certain equipments we have at the Head Quarters back in the city, that we have to pick up before we head over to the facility. When we had located us at the scene, we started to conducting some tests. Once all the tests had been completed, and no faults being shown we proceeded with the launch. The structure it self was fire proof, therefore we are able to still be in the building. The control room is only available for the Governance and Main Rocket Scientist, due to the controls available. This briefing is probably a bit farfetched, therefore I am going to give you a personal briefing at the rocket center.

However, some changes were made in our somewhat plan. The President came to visit and was in the control room during the actual take off. The launch was successful and so was the rockets home trip (to recycle the metal). The satellite of ours is now fully updated and our frequency have not been better. Thanks to all who attended.


[spoiler=Images]
[Image: 0nYIfKtl.jpg]
[Image: UInUYDdl.jpg]
[Image: LdO0p9Ml.jpg]
[Image: YR0pirnl.jpg]
[Image: zSlT5Ftl.jpg]
[Image: eKX4B41l.jpg]
[Image: dwHTwi8l.jpg]
[Image: BsKumuSl.jpg]
[Image: rdU8LTyl.jpg]
[Image: 6g10JWnl.jpg]
[Image: 5QJ16eSl.jpg]
[Image: sDNs6d4l.jpg]
[Image: pLbJHw1l.jpg]
[Image: kAFkB9yl.jpg]
[Image: LVZB30Gl.jpg]
[Image: PUZnp3Vl.jpg]
[Image: AgFZnYTl.jpg]
[Image: fQBGsJGl.jpg]
[Image: YTGoVZhl.jpg]
[Image: nYoRKxGl.jpg]
[Image: kE6kzSrl.jpg]
[Image: 76ES1Rnl.jpg]
[Image: QLSYVoxl.jpg]
[Image: 6SeJAaal.jpg]
[Image: lCEfbvbl.jpg]
[Image: Vu0PB05l.jpg]
[Image: WlbwXYXl.jpg]
[/spoiler]
Kind Regards,
Floodify
The following 3 users Like Floodify's post:
  • Donuts, NotSep, Iraqi Eagle


Messages In This Thread
Satallite Maintenance - Estleback Corporation - by Floodify - 01-19-2014, 12:55 AM

Forum Jump:


Users browsing this thread: 2 Guest(s)